Sponsored
Home Intuition Leader and Gutter Guard from Leaves, Twigs, Branches Plastic Mesh Guards Leaf Protector
$16.11 reg $18.95
Sale save $2.84 (15% off)
In Stock
Eligible for registries and wish lists
Sponsored
About this item
Highlights
- Keeps leaves and dirt out of gutters.
- Can easily be cut to size with regular scissors.
- Plastic design safeguards against rust.
Description
Protect Your Gutters from Clogging
Protection from leaves, branches and more!
Keep your gutters clean all year long from leaves, debris and dirt with Home Intuition Plastic Mesh gutter Guards.
hand holding scissor cutting gutter guard
Cut to Size
Easily size the gutter guard to the perfect length for your home. Easily cuts with a standard pair of scissors.
gutter on home roof with gutter guard installed with debris being blocked and only water going in
top view of gutter with guard installed
dimensions shown on gutter guard
Nothing but Water in your Gutters
Keep your gutters clean all season long with Home Intuition Gutter Guards
Protection from Leaves, Branches and all debris
Protect your gutters from all elements that go in and clog it up.
Perfect Size
Each roll of Home Intuition Gutter Guards measure 6 inches wide by 20 feet long.
Dimensions (Overall): .2 inches (H) x 6 inches (W) x 240 inches (D)
Weight: .64 pounds
Material: Plastic
Warranty: 2 Year Limited Warranty. To obtain a copy of the manufacturer's or supplier's warranty for this item prior to purchasing the item, please call Target Guest Services at 1-800-591-3869
TCIN: 91137641
UPC: 810111241977
Origin: imported
The above item details were provided by the Target Plus™ Partner. Target does not represent or warrant that this information is accurate or complete. On occasion, manufacturers may modify their items and update their labels.
We recommend that you do not rely solely on the information presented. If you have a specific question about this item, you may consult the item's label, contact the manufacturer directly or call Target Guest Services at 1-800-591-3869.
If the item details aren’t accurate or complete, we want to know about it.
Shipping details
Estimated ship dimensions: 5 inches length x 5 inches width x 7 inches height
Estimated ship weight: 5 pounds
This item cannot be shipped to the following locations: American Samoa (see also separate entry under AS), Guam (see also separate entry under GU), Northern Mariana Islands, Puerto Rico (see also separate entry under PR), United States Minor Outlying Islands, Virgin Islands, U.S., APO/FPO, Alaska, Hawaii
item ships from third party seller: Home Intuition
Return details
This item can be returned to any Target store or Target.com.
This item must be returned within 30 days of the date it was purchased in store, shipped, delivered by a Shipt shopper, or made ready for pickup.
See the return policy for complete information.
Warning: This product contains chemicals known to the State of California to cause cancer and birth defects or other reproductive harm. For more information: www.P65Warnings.ca.gov For more information, go to https://www.p65warnings.ca.gov/
Guests also viewed
$19.99 - $119.99
reg $44.99 - $759.99 Sale
3.9 out of 5 stars with 16 ratings